Clinical Partner Monthly Update http://advancedparticletherapy.com/clinical-partners/dallas-proton-treatment-center/monthly-update en test http://advancedparticletherapy.com/test <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p>test</p> </div></div></div> Fri, 04 Dec 2015 20:33:39 +0000 scallahan 2956 at http://advancedparticletherapy.com Dallas Proton Treatment Center Update – Dec 2014/Jan 2015 http://advancedparticletherapy.com/dallas-proton-treatment-center-update-%E2%80%93-dec-2014jan-2015 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="" src="/sites/default/files/2014%2012%2010%20Treatment%20Bunker%20Looking%20East%20%28DJI00030%29.JPG" style="width: 150px; height: 84px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />December has been busy at the job site.  Hunt Construction, the General Contractor on the project, continues to place the piers for the foundation. We have 272 out of 299 piers in place which represents 91% of the total.</p></div></div></div> Mon, 29 Dec 2014 23:35:44 +0000 scallahan 2921 at http://advancedparticletherapy.com Dallas Proton Treatment Center Update – Oct/Nov 2014 http://advancedparticletherapy.com/dallas-proton-treatment-center-update-%E2%80%93-octnov-2014 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Dallas Proton Treatment Center Construction October 2014" src="/sites/default/files/%2804%29%202014%2010%2020%20Pulling%20Treatment%20Bunker%20Pier%20Casing.JPG" style="width: 200px; height: 150px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />Construction continues on the Dallas Proton Treatment Center in Dallas, Texas. Despite the wet weather the project continues to move forward rapidly.  Hunt, the general contractor on the project, continues to place piers at the site, with a total of 238 out 299 piers in place as of November 7<sup>th</sup>.</p></div></div></div> Thu, 13 Nov 2014 17:24:36 +0000 scallahan 2841 at http://advancedparticletherapy.com Dallas Proton Treatment Center Update – September 2014 http://advancedparticletherapy.com/dallas-proton-treatment-center-update-%E2%80%93-september-2014 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Dallas Proton Treatment Center September 2014" src="/sites/default/files/09_14_DPTC_Image_Site_%20Power%20South%20Tower%20Crane%20Foundation.jpg" style="width: 200px; height: 131px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />The Dallas Proton Treatment Center construction continues to progress in Dallas, Texas.</p></div></div></div> Wed, 22 Oct 2014 18:27:42 +0000 scallahan 2799 at http://advancedparticletherapy.com Dallas Proton Treatment Center Update – August 2014 http://advancedparticletherapy.com/dallas-proton-treatment-center-update-%E2%80%93-august-2014 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="" src="/sites/default/files/%282%29%202014%2009%2018%20Drilling%20Parking%20Garage%20Pier.JPG" style="width: 200px; height: 150px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />The Dallas Proton Treatment Center continued construction during the month of August. During the past month, installation continued on the storm water system, telecommunications, natural gas lines and other utilities. There are three drilling rigs on site drilling and pouring the piers to support the foundation for the facility.</p></div></div></div> Wed, 24 Sep 2014 23:23:18 +0000 scallahan 2765 at http://advancedparticletherapy.com Dallas Proton Treatment Center Update – July 2014 http://advancedparticletherapy.com/dallas-proton-treatment-center-update-%E2%80%93-july-2014 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="The Dallas Proton Treatment Center in Dallas Texas" src="/sites/default/files/DPTC_Rendering_Interior_Stairs.jpg" style="width: 200px; height: 119px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />In July of 2014, Advanced Particle Therapy and Dallas Proton Treatment Center LLC began construction of the 110,000 square foot Dallas Proton Treatment Center. The five treatment room center will be operated by the University of Texas Southwestern Medical Center  and specifically the Department of Radiation Oncology.</p></div></div></div> Tue, 19 Aug 2014 22:21:30 +0000 scallahan 2724 at http://advancedparticletherapy.com