Clinical Partner Monthly Update http://advancedparticletherapy.com/clinical-partners/georgia-proton-treatment-center/monthly-update en Emory Proton Therapy Center - Dec 2014/Jan 2015 Update http://advancedparticletherapy.com/emory-proton-therapy-center-dec-2014jan-2015-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="" src="/sites/default/files/12_14_EPTC_Image_Site_Building4.jpg" style="width: 150px; height: 100px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />Brasfield and Gorrie, the General Contractor, has completed the façade of the building, including placement of all of the precast panels and glass pieces.  Inside the building drywall is mostly complete with first coat painting mostly complete as well.  Now the layout of the clinical and administrative sections of the building are really evident as you walk through.  The building is getting closer and closer to be</p></div></div></div> Mon, 29 Dec 2014 23:26:58 +0000 scallahan 2920 at http://advancedparticletherapy.com Emory Proton Therapy Center - November 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-november-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Therapy Center Construction 11-14" src="/sites/default/files/11_14_EPTC_Image_Site_GlassFacade_0.jpg" style="width: 150px; height: 100px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />November was a good month for the construction of the Emory Proton Therapy Center.  Brasfield &amp; Gorrie, the General Contractor, continued their progress on the building’s three levels. </p></div></div></div> Fri, 19 Dec 2014 00:32:12 +0000 scallahan 2884 at http://advancedparticletherapy.com Emory Proton Therapy Center - October 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-october-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Construction at the Emory Proton Therapy Center in Atlanta, GA" src="/sites/default/files/DSC_0023_MV_BPPELUSIKYXA_ozttdjexv08x.JPG" style="width: 150px; height: 100px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />October was a great month for the Emory Proton Therapy Center.  With the building being “dried in”, Brasfield &amp; Gorrie, the General Contractor on the project, was able to make quick progress through October. </p></div></div></div> Mon, 03 Nov 2014 19:27:39 +0000 scallahan 2818 at http://advancedparticletherapy.com Emory Proton Therapy Center - September 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-september-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="emory proton therapy center atlanta ga sept 2014" src="/sites/default/files/09_14_EPTC_Image_Site_CurtainWall_1.jpg" style="width: 150px; height: 113px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />September saw the Emory Proton Therapy Center make more strides.  With a few strategic exceptions, the façade of the main building is now complete.  This is great news, as it allows for the building itself to be dried in, or sealed from the elements.  Due to this milestone, the contractor, Brasfield &amp; Gorrie, can really charge forward during October getting u</p></div></div></div> Wed, 22 Oct 2014 18:18:31 +0000 scallahan 2798 at http://advancedparticletherapy.com Emory Proton Therapy Center - August 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-august-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Treatment Center" src="/sites/default/files/DSC_0018_MV_XTYBSUCGQMRD_1peyl4dt587w.JPG" style="width: 150px; height: 100px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />August was a busy month at the Emory Proton Treatment Center.  Brasfield and Gorrie made big strides in installing the glass and precast concrete panels that make up the exterior of the facility.  Now the only facade work remaining lies along the Juniper Street side of the building, plus some other odds and ends.  The building is also getting very close to being dried in, so that</p></div></div></div> Mon, 08 Sep 2014 16:53:23 +0000 scallahan 2735 at http://advancedparticletherapy.com Emory Proton Therapy Center - July 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-july-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Therapy Center Construction 2014" src="/sites/default/files/MultivistaPhoto-2014-08-07.JPG" style="width: 200px; height: 133px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />July has seen more progress getting the exterior of the building put into place. Now when you see the building, you see much of the precast panels and glass in place. The building is truly taking shape now, which is very exciting.</p></div></div></div> Mon, 18 Aug 2014 18:35:16 +0000 scallahan 2717 at http://advancedparticletherapy.com Emory Proton Therapy Center - June 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-june-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Therapy Center Construction Site July 2014 Atlanta GA" src="/sites/default/files/07_14_EPTC_Image_Site_CurtainWallInstallation.JPG" style="width: 200px; height: 133px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />June brought an exciting new phase to the construction of the center, with the façade of the building starting to go up.</p></div></div></div> Fri, 11 Jul 2014 21:49:10 +0000 scallahan 2695 at http://advancedparticletherapy.com Emory Proton Therapy Center - May 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-may-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Inside of proton therapy gantry space at the Emory Proton Therapy Center" src="/sites/default/files/DSC_0006_MV_IJUIDPUWGTCX_d4qby02cny22.JPG" style="width: 250px; height: 166px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />In May, Brasfield &amp; Gorrie, the General Contractor for the Emory Proton Therapy Center construction, focused on continuing to make progress in the concrete portion of the Center.</p></div></div></div> Thu, 05 Jun 2014 17:48:40 +0000 scallahan 2689 at http://advancedparticletherapy.com Emory Proton Therapy Center - April 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-april-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Therapy Center Construction Photo April 2014" src="/sites/default/files/04_14_EPTC_Image_Site_3Story.JPG" style="width: 150px; height: 100px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />April brought continued dramatic changes to the Emory Proton Therapy Center project.  Progress continued to be made quickly on preparing the steel-framed building.   Metal decking was completed on all levels, providing a “roof” and “floor” on each of the center’s three levels.   Steel work to provide the attachment points for the large, precast concrete, façade</p></div></div></div> Tue, 06 May 2014 00:02:47 +0000 scallahan 2664 at http://advancedparticletherapy.com Emory Proton Therapy Center - March 2014 Update http://advancedparticletherapy.com/emory-proton-therapy-center-march-2014-update <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even" property="content:encoded"><p><img alt="Emory Proton Therapy Center Construction Steel - March 2014" src="/sites/default/files/03_14_EPTC_Image_Site_Steel6.JPG" style="width: 150px; height: 99px; border-width: 1px; border-style: solid; margin: 5px; float: left;" />The Emory Proton Therapy Center continues to come closer to bringing cutting edge cancer care to the people of Atlanta, the State of Georgia and the southeast. This month the main steel structure was completed.</p></div></div></div> Fri, 04 Apr 2014 23:56:14 +0000 scallahan 2638 at http://advancedparticletherapy.com